How to Draw a Value Stream Map

By Nicholas Williford, Lean Six Sigma Black Belt · About LimitLine

A value stream map is a one-page picture of every step, wait and inventory between a customer's order and the shipment, with the timeline that shows how much of the lead time adds value.

The map's job is to show where the time goes between the customer's order and the shipment. Most of it is waiting, and the map makes that visible in one picture. Below: the five numbers you need, a worked three-step map, and how to read it.

Takt timenet available time ÷ customer demandWait at a queuepieces waiting ÷ throughput (Little's Law)Lead timeprocessing time + all the waits% value-addedvalue-added time ÷ lead time

Step by Step

  1. Pick one product family and walk the floor from shipping back to receiving. Map what happens, not what the procedure says.
  2. Draw a box for each step and write its cycle time (CT), how much of that is value-added (VA: the customer would pay for it), and changeover time and uptime if they matter.
  3. Count the inventory between the steps (the triangles). Count it, don't estimate it.
  4. Work out takt time from the customer demand and the time you actually have to make it.
  5. Draw the timeline: waits up, processing down, and add them up into lead time and % value-added.

Worked Example

One shift of 8 hours (28,800 seconds net), demand 480 pieces, steady output of 60 pieces an hour. Three steps: Cut, Assemble and Pack, with 20 pieces waiting before Assemble and 40 before Pack. (An illustrative example, not real plant data.)

CutCT 40 sVA 30 sI20 pcsAssembleCT 50 sVA 40 sI40 pcsPackCT 30 sVA 20 sSlowest step40 s20 min wait50 s40 min wait30 sLead time 62 min · value-added 90 s (2.4%) · takt 60 s
The map as LimitLine's VSM tool lays it out: process boxes, inventory triangles and the timeline. Assemble is the slowest step.
NumberCalculationResult
Takt time28,800 s ÷ 480 pieces60 s
Wait before Assemble20 pieces ÷ 60 per hour20 min
Wait before Pack40 pieces ÷ 60 per hour40 min
Processing time40 + 50 + 30 s120 s
Lead time120 s + 1,200 s + 2,400 s3720 s (62 min)
Value-added time30 + 40 + 20 s90 s
% value-added90 ÷ 37202.4%

How to Read It

Three Common Mistakes

  1. Adding cycle times and calling it lead time. Lead time includes every wait; here it is 31 times the processing time.
  2. Mixing units. Pieces waiting ÷ pieces per hour gives hours; keep WIP and throughput in the same unit and at the same point in the flow.
  3. Mapping the whole plant. One product family, door to door, is enough for a first map.
Draw this map in LimitLineThe VSM tool's example starts with this three-step line and works out takt, lead time and % value-added (a Pro tool; Free users can try it on the example).

Sources

  1. M. Rother and J. Shook (1999), Learning to See: Value Stream Mapping to Add Value and Eliminate Muda, Lean Enterprise Institute
  2. J. D. C. Little (1961), A Proof for the Queuing Formula L = λW, Operations Research 9(3)