Two questions decide it. Are you measuring something (a length, a weight, a time) or counting something (defects, failed items)? And how many do you take per sample?

Your dataChartNotes
Measurements, one at a timeI-MROne reading per batch, shift or day. Guide
Measurements, subgroups of 2 to 9X̄-RFor example 5 parts measured every hour.
Measurements, subgroups of 10 or moreX̄-SThe standard deviation beats the range at this size.
Defective items (pass/fail), sample size variespPlots the fraction defective, limits per sample.
Defective items (pass/fail), same sample sizenpPlots the number defective.
Defects (a unit can have several), same amount inspectedcScratches per panel, errors per form.
Defects, amount inspected variesuPlots defects per unit.

Measuring

Measurements carry more information than counts, so measure when you can. With one value per time period use the I-MR chart. With rational subgroups (several parts made close together) use X̄-R up to 9 per subgroup and X̄-S from 10. The X̄-R limits use the constants A2, D3 and D4; for subgroups of 5, A2 = 0.577 and D4 = 2.114, as in NIST's table.

Counting

First decide what you count. A defective is a whole item that fails (pass or fail, binomial): use p or np. A defect is a flaw, and one item can have several (Poisson): use c or u. Then: if the sample size or inspection area changes from sample to sample, use the per-unit chart (p or u), whose limits move with each sample.

Common mistakes

Answer the two questions in the appLimitLine's “Which chart?” tab asks them and opens the right chart.

Sources

  1. NIST/SEMATECH e-Handbook, §6.3.2.1 Shewhart X-bar and R and S Control Charts
  2. NIST/SEMATECH e-Handbook, §6.3.3.1 Counts Control Charts
  3. NIST/SEMATECH e-Handbook, §6.3.3.2 Proportions Control Charts