How to calculate Cp and Cpk

Cp and Cpk compare how wide your process runs with how wide the specification allows. Cp ignores where the process is centred; Cpk counts the side closest to a spec limit, so it is the one that predicts out-of-spec parts.

The short answer. With spec limits LSL and USL, process mean μ and within-process standard deviation σ:

Cp  = (USL − LSL) / (6σ)Cpk = the smaller of      (USL − μ) / (3σ) and      (μ − LSL) / (3σ)

Worked example (NIST)

The NIST/SEMATECH e-Handbook uses a process with USL = 20, LSL = 8, mean μ = 16 and σ = 2.

StepCalculationResult
Spec width over process width(20 − 8) / (6 × 2) = 12 / 12Cp = 1.00
Upper side(20 − 16) / (3 × 2) = 4 / 6CPU = 0.67
Lower side(16 − 8) / (3 × 2) = 8 / 6CPL = 1.33
Take the smaller sidemin(0.67, 1.33)Cpk = 0.67

Cp = 1.00 says the process would just fit inside the specification if it were centred. Cpk = 0.67 says it isn't: the mean sits 4 units from the upper limit but 8 from the lower, so the upper tail spills over. Centring the process at 14 would lift Cpk to 1.00 without reducing variation at all.

Where σ comes from: Cpk vs Ppk

The formulas are the same; only σ changes.

If Ppk is much lower than Cpk, the process moves around over time; fix that before chasing short-term variation.

Example with real data

NIST's ten flow-rate measurements (the same data as our I-MR chart guide), with spec limits 45 to 57:

StatisticValue
Mean50.81
σ within = MR̄ / 1.128 = 1.8778 / 1.1281.6647
s overall2.0339
Cp1.20
Cpk1.16
Pp0.98
Ppk0.95

Ten points is a small sample. The 95% confidence interval for this Cpk runs from about 0.59 to 1.74 (Bissell's approximation), so the honest summary is "somewhere between poor and good: collect more data." LimitLine shows this interval in its verdict.

What is a good Cpk?

CpkWhat it means
below 1.00The process spreads past at least one spec limit: expect out-of-spec parts.
1.00 to 1.33Fits, with little room. A small shift produces defects.
1.33A common minimum target for an established process (LimitLine's default Cpk goal).
1.67 or moreOften asked for on new or safety-critical characteristics.

Targets are set by your customer or your own quality plan; these are common conventions, not universal rules.

Three checks before you trust a Cpk

  1. The process is stable. Plot a control chart first. A process with special causes has no single σ, and its Cpk describes nothing in particular.
  2. The data are roughly normal. Cpk turns σ into a defect rate through the normal curve. Strongly skewed data need a different method.
  3. There is enough data. With fewer than about 25 to 30 points the confidence interval is wide, as above.
Try this example in LimitLineOpens with the flow-rate data and spec limits 45 to 57 already loaded. Free, nothing to install.

Sources

  1. NIST/SEMATECH e-Handbook of Statistical Methods, §6.1.6 What is Process Capability?
  2. NIST/SEMATECH e-Handbook, §6.3.2.2 Individuals Control Charts (flow-rate data)
  3. A. F. Bissell (1990), “How Reliable Is Your Capability Index?”, Applied Statistics 39(3), 331–340 (Cpk confidence interval)