c Chart and u Chart: Control Charts for Defect Counts
A c chart plots the number of defects in equal-sized samples and a u chart plots defects per unit when the sample size varies; both take their limits from the Poisson distribution.
The choice comes down to one question: is every sample the same size? If yes, chart the raw count (c chart); if the amount inspected changes, chart the count per unit (u chart). Both rest on the Poisson distribution, so the limits come from the average alone.
c chartc̄ ± 3√c̄u chartū ± 3√(ū ÷ n), n = units in that samplec̄, ūtotal defects ÷ samples, total defects ÷ total unitsLCL0 if the formula gives a negative number
Defects or Defectives?
| You count | Same sample size | Sample size varies |
|---|---|---|
| Defects (flaws; one part can have several) | c chart | u chart |
| Defectives (bad parts; each part is good or bad) | np chart | p chart |
Worked Example: c Chart (NIST, Defects on 25 Wafers)
NIST counts the defects on each of 25 wafers. The average is 16 defects, so the limits are 16 ± 3√16 = 16 ± 12.
These are the values NIST prints: center 16, UCL 28, LCL 4. LimitLine runs this example as a regression test; see the validation page.
Worked Example: u Chart (Montgomery, Defects in Computers)
Twenty samples of 5 computers each. The average is ū = 1.93 defects per computer, so UCL = 1.93 + 3√(1.93 ÷ 5) = 3.79 and LCL = 0.07, the limits from Montgomery's center line. When the number of units changes from sample to sample, each sample gets its own limits (wider for small samples), which is why the u chart, not the c chart, is the right one for unequal samples.
Three Common Mistakes
- A c chart with different sample sizes. A bigger batch has more defects for no reason except its size; use a u chart.
- Mixing defects and defectives. Counting flaws needs c or u; counting rejected parts needs p or np.
- Huge counts with false alarms everywhere. When almost every point is out, the Poisson assumption is too narrow for your process; the Laney U′ chart widens the limits by the variation actually seen.
Sources
- NIST/SEMATECH e-Handbook, §6.3.3.1 Counts Control Charts
- D. C. Montgomery, Introduction to Statistical Quality Control, p. 318 (defects in computers), as reproduced in the IMSL JMSL 6.0 UChart documentation, which does not state the edition